Central Europe
SBU Operations
Centers
(Small Business Units).
Ready-to-use Light Industrial infrastructure for Asian technology brands. Localize core operations in the EU, solve reverse logistics bottlenecks, deploy assembly processes, host B2B showrooms, and run high-value e-commerce fulfillment. Standard allocation of 200 kW active power per SBU module (upgradable to 350 kW), 10 Gb/s connectivity, located directly in the A2 highway corridor (Poznań, Poland).
Tailored for Light
Manufacturing
and Reverse Logistics.
SBU facilities adapted to handle reverse logistics and light assembly. Ready infrastructure for test stations and electronics assembly. Instead of paying for passive box storage, recover frozen capital from damaged equipment (RMA) and drastically cut customs duties through local assembly (SKD).
200 kW ACTIVE POWER
SBU allocation sufficient to power manual assembly stations, equipment test stations, firmware flashing, and IT infrastructure.
POWER SECUREMENT
Optional UPS redundancy for critical IT processes and secure Level 2 repair cycles.
10 Gb/s SYMMETRICAL FIBER
10 Gb/s symmetrical connection with full redundancy. Guaranteed bandwidth (equal upload and download) essential for mass firmware flashing, secure VPN tunneling, and flawless real-time WMS/ERP synchronization with the Asian headquarters.
SECURITY AND SCALABILITY
Strict NDA enforcement and 24/7 monitoring. Floor space prepared for adaptation (tenant CAPEX) to strict fire safety requirements for Li-Ion battery quarantine zones.
Deployment Models
Managed Reverse Logistics (RMA Center)
- check_circle Stop losing margins on shipping electronics back to Asia.
- check_circle Operational support for compliance with EU "Right-to-Repair" laws.
- check_circle Technical triage and Level 2 refurbishment.
- check_circle Pricing: Tiered SLA and operational fees (Flat triage rate + hourly repair rate).
Boutique SKD Assembly (Contract Manufacturing)
- check_circle Transition from CBU import to localized SKD contract assembly.
- check_circle Supply chain optimization for "Assembled in EU" status (process support in meeting the >25% local value-added requirement).
- check_circle Legal compliance with the >25% local value-added requirement.
- check_circle Process support in preparing the assembly line for certification audits (e.g., EN 15194) and safe battery integration.
B2B Showroom Center (Light Automation)
- check_circle Break the trust deficit of EU buyers through the physical presence of machines.
- check_circle Demonstrations of light automation (cobots) and electronic equipment.
- check_circle B2B Customer Service Center for the DACH region.
- check_circle Pricing: Hybrid consignment agreements (Flat floor space fee + success fee).
High-Value E-Commerce 3PL Fulfillment
- check_circle Position expensive technology (custom SKUs) closer to the European end-user.
- check_circle Order fulfillment for high-value tech (Custom SKUs).
- check_circle Native WMS integration with Shopify / Amazon.
- check_circle Agile EU distribution (24-48h delivery in the DACH region).
The A2 Highway
Pulse Point
Located directly in the A2 highway corridor and intermodal routes.
Modular Deployment:
T-Zero Timeline and Facility Matching
We do not force a single, generic warehouse. We match a facility from our portfolio (SBU units, Brownfield post-industrial spaces) strictly to your operating model. This allows for the optimization of adaptation costs (Fit-out).
Hard T-Zero (Time Zero) Rule: Our model assumes zero operator credit for adaptation. All time estimates start from the T-Zero moment – the clearing of adaptation funds (CAPEX) from the client towards construction works. Deployment time depends on the selected budget (Fast-Track Path with contractor premiums vs. Standard market rates and queues).
+
PATH
01: Managed Reverse Logistics (RMA Center)
Estimated Time-to-Market: 8 – 12 weeks (from T-Zero - CAPEX payment)
+
PATH
02: Boutique SKD Assembly
Estimated Time-to-Market: 3 – 18+ months (from T-Zero - CAPEX payment)
+
PATH
03: B2B Showroom Center
Estimated Time-to-Market: 4 – 8 weeks (from T-Zero - CAPEX payment)
+
PATH
04: E-Commerce 3PL (High-Value SKU)
Estimated Time-to-Market: 4 – 6 weeks (from T-Zero - CAPEX payment)
Initiate Infrastructure Protocol
Direct channel for Managing Directors and Heads of Operations. Connect via WeChat or e-mail.
INFO
Industrial Operations Lead
info@techhub-poznan.com
For our Asian Partners:
Scan the QR code above to connect directly with the Operations Board via WeChat or e-mail.